Fifteen 5.5″ helical piles at 64 feet of embedment and a 5 degree batter for a new wireless telecom tower in Niagara Falls.

Commercial project | Niagara Falls, ON

Helical Piles for a Telecom Tower in Niagara Falls

Fifteen 5.5″ helical piles, each one 64 feet deep and set at a 5 degree batter, now carry a new wireless telecommunications tower in Niagara Falls.

Request a Quote (289) 221-5711
Aerial view of two excavators opening the telecom tower foundation pit in Niagara Falls

Structure

Wireless telecom tower

Location

Niagara Falls, ON

Piles

15 helical piles, 5.5″ shaft

Embedment

64 ft per pile

Lead and extensions

16 ft lead + three 16 ft extensions

Batter

5 degrees

Target torque

30,000 ft-lbs

Completed

September 2026

A foundation that has to hold in tension

A telecom tower doesn’t only push down on its foundation. Wind on the mast tries to pull one side of the base up, so the footing has to resist uplift as well as carry weight. On this site the excavators opened the pit for the tower base first, and every pile went in from the bottom of that dig.

Excavated foundation pit for the telecom tower in Niagara Falls before any piles went in
Installed helical piles spread across the excavation for the telecom tower foundation

64 feet down, at a 5 degree angle

Each pile started with a 16-foot lead. Our crew then added three 16-foot extensions, which put all 15 piles at 64 feet of embedment. They went in at a 5 degree batter, an angle set to handle the tension loads coming from the tower.

Torque checked on every pile

The installation torque target was 30,000 ft-lbs. Torque is the number we watch on each pile as it goes down, because it’s how capacity gets confirmed in the field. We explain the link in more detail in our article on how installation torque relates to pile capacity.

Helical pile with a welded steel cap plate inside the tower excavation
Crew member welding a cap plate onto a helical pile at the Niagara Falls tower site

Cap plates welded on site

With the piles at depth, the crew welded square steel cap plates onto the pile tops right in the excavation. The welder rode in on a skid steer and sat at the edge of the pit, a few steps from the pile field.

Project summary

For this Niagara Falls telecom tower, DiamondTech Piles installed 15 helical piles with a 5.5″ shaft. Each pile reached 64 feet of embedment using a 16-foot lead and three 16-foot extensions, was battered at 5 degrees for the tower’s tension loads, and was installed to a 30,000 ft-lbs torque target.

Project photos

Commercial piles across southern Ontario

Towers, equipment pads and modular buildings are all part of our commercial and industrial helical pile foundations work. You can see the towns and regions we cover on our helical pile service areas page, and the shaft sizes we install on our helical pile specifications page.

Planning a tower or commercial foundation?

Send us the drawings and site details and we’ll come back with a quote. Call (289) 221-5711 or use the form.

Request a Quote Call (289) 221-5711